South Asia

Theory and practical training of IntelloCut solution in Hoodvian factory, Sri Lanka

#FabricOptimisation

Hoodvian Group automates fabric planning and tracking with FastReactFabric

Hoodvian achieves resounding results with the implementation of FastReactFabric and the group’s continued investment in innovation and digital transformation.

South East Asia

Professionals wearing Sodexo uniforms

#DesignandDevelop

Sodexo supports accelerated growth with VisionPLM

The Global Supply Management (GSM) team have selected Coats Digital’s VisionPLM to boost productivity and drive connectivity across the supply…

South East Asia

Nice Group production floor with workers and sewing machines

#ProductionPlanning

Nice Group improves efficiency and customer satisfaction with FastReactPlan

The leading sportswear manufacturer has been able to increase performance to plan from 80% to 91% and factory efficiency by…

South Asia

Woman working on a sewing machine in Epyllion factory in Bangladesh

#MethodTimeCostOptimisation

GSDCost gives Epyllion transparency of their true cost of production

Epyllion now has the tools to set meaningful production targets based on fact-based capacity data. Additionally, the lost business opportunities,…

South Asia

#ProductionPlanning

Panam Group Boosts Production Planning Efficiency with FastReactPlan

Panam Group use FastReactPlan’s high level capacity and detailed line level sewing planning boards to manage production capacities, which in…

South East Asia

IntelloCut training at Song Hong factory

#FabricOptimisation

FastReactFabric helps Song Hong to reduce 60% of fabric planning time

FastReactFabric accounts all the wastages on the cutting floor and reconciles the data in the reports for any desired date…

South East Asia

IntelloCut project manager training the Pan Brothers team

#FabricOptimisation

PT. Pan Brothers Tbk. boost their production efficiency by 10% using FastReactFabric

FastReactFabric helped Pan Brothers to implement proper end-bit utilisation and fabric management on the cutting floor leading to significant efficiency…

South East Asia

Concept training of IntelloCut solution at Luenthai GJM factory, China

#FabricOptimisation

GJM (Luenthai) cuts fabric wastage to boost its top-line with FastReactFabric

GJM improves their processes to generate real-time optimised plans, fabric tracking and reports with the objective of boosting performance and…

South Asia

#ProductionPlanning

Esquire Knit Composite Ltd use FastReactPlan to improve control of pre-sewing processes resulting in 60% factory efficiency improvement

Improvements in capacity management and order control leads to reduced down-time and better delivery performance

South Asia

Image of the presser foot and needle of a sewing machine

#ProductionPlanning

MAS Active achieve substantial performance improvements with FastReactPlan

The top sportswear supplier dramatically improved performance to plan, increased factory productivity and enhanced customer service

Europe, Middle East, and Africa

Model in black dress with dark background

#DesignandDevelop

REISS achieves improved visibility and control with VisionPLM

The British fashion brand and retail store chain is set to improve range selection and buying processes by using VisionPLM,…

South East Asia

Woman worker working on a sewing machine in Sabrina factory, Taiwan

#MethodTimeCostOptimisation

GSDCost implementation is the catalyst for change at Sabrina

By using GSDCost, the innovative garment manufacturer, has increased productivity efficiencies by 15% as well as significantly improving methods.